WARNING: THIS SITE IS A MIRROR OF GITHUB.COM / IT CANNOT LOGIN OR REGISTER ACCOUNTS / THE CONTENTS ARE PROVIDED AS-IS / THIS SITE ASSUMES NO RESPONSIBILITY FOR ANY DISPLAYED CONTENT OR LINKS / IF YOU FOUND SOMETHING MAY NOT GOOD FOR EVERYONE, CONTACT ADMIN AT ilovescratch@foxmail.com
Skip to content

feat Updating the overall project CI/CD and openapi-generator depende… #1

feat Updating the overall project CI/CD and openapi-generator depende…

feat Updating the overall project CI/CD and openapi-generator depende… #1

Triggered via push August 11, 2025 23:44
Status Failure
Total duration 12s
Artifacts

python.yaml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

9 errors
build (3.11)
Process completed with exit code 1.
build (3.10)
The operation was canceled.
build (3.10)
The strategy configuration was canceled because "build._3_11" failed
build (3.9)
The operation was canceled.
build (3.9)
The strategy configuration was canceled because "build._3_11" failed
build (3.13)
A task was canceled.
build (3.13)
The strategy configuration was canceled because "build._3_11" failed
build (3.12)
The operation was canceled.
build (3.12)
The strategy configuration was canceled because "build._3_11" failed