chore(deps): Bump actions/checkout from 5 to 6 #28
Triggered via pull request
November 21, 2025 11:10
Status
Failure
Total duration
6h 1m 27s
Artifacts
–
Annotations
11 errors
|
test (ubuntu-latest, 28.2, false)
Process completed with exit code 2.
|
|
test (ubuntu-latest, 26.3, false)
Process completed with exit code 2.
|
|
test (ubuntu-latest, 27.2, false)
Process completed with exit code 2.
|
|
test (windows-latest, 29.4, false)
Process completed with exit code 1.
|
|
|
|
test (windows-latest, 27.2, false)
The job has exceeded the maximum execution time of 6h0m0s
|
|
test (windows-latest, 27.2, false)
The operation was canceled.
|
|
test (windows-latest, 28.2, false)
The job has exceeded the maximum execution time of 6h0m0s
|
|
test (windows-latest, 28.2, false)
The operation was canceled.
|
|
test (windows-latest, 26.3, false)
The job has exceeded the maximum execution time of 6h0m0s
|
|
test (windows-latest, 26.3, false)
The operation was canceled.
|