WARNING: THIS SITE IS A MIRROR OF GITHUB.COM / IT CANNOT LOGIN OR REGISTER ACCOUNTS / THE CONTENTS ARE PROVIDED AS-IS / THIS SITE ASSUMES NO RESPONSIBILITY FOR ANY DISPLAYED CONTENT OR LINKS / IF YOU FOUND SOMETHING MAY NOT GOOD FOR EVERYONE, CONTACT ADMIN AT ilovescratch@foxmail.com
Skip to content

run-tests

run-tests #2452

Triggered via schedule September 23, 2025 00:31
Status Failure
Total duration 49s
Artifacts

run-tests.yml

on: schedule
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

5 errors
P8.3 - L12.* - prefer-stable
Process completed with exit code 1.
P8.2 - L11.* - prefer-stable
The operation was canceled.
P8.2 - L11.* - prefer-stable
The strategy configuration was canceled because "test._8_3_12___prefer-stable" failed
P8.4 - L12.* - prefer-stable
The operation was canceled.
P8.4 - L12.* - prefer-stable
The strategy configuration was canceled because "test._8_3_12___prefer-stable" failed